Projects

Completed Projects

In VIKNAtech Engineering Sdn. Bhd., we have a wide and in-depth know-how and knowledge in design, engineering and project management of Palm Oil Mills, Kernel Crushing Plants, Palm Oil Refinery and Bulking Installation.

Year Project Owner Location
2003 Design of 45-90 TPH Havys Palm Oil Mill Havys Oil Mill Sdn. Bhd. Keratong, Pahang.
2005 Vegetable Oil Bulking Installation. Pacific Oil and Fats Industries Sdn. Bhd. Pasir Gudang, Johor.
2005 Extension of Syarikat Perusahaan Kelapa Sawit Palm Oil Mill Bell Group of Companies Pagoh, Johor.
2008 45-60 TPH ACE Palm Oil Mill ACE Agricultural Sdn. Bhd. Keratong, Pahang.
2010 Extension of Sri Lingga Palm Oil Mill Bell Group of Companies Kuala Sungai Baru, Melaka.
2010 Extension of Southern Malay Palm Oil Mill Southern Group Simpang Rengam, Johor.
2010 Design of Composting Plant Myagri Nutribio Sdn. Bhd. Various location
2010 Design of 45-60 TPH Sungai Lembing Palm Oil Mill Kilang Sawit Lembing Sdn. Bhd. Kuantan, Pahang.
2012 Design of 30-60 TPH Sri Jelutung Palm Oil Mill Sri Jelutung Palm Oil Mill Sdn. Bhd. (Kurnia Setia Berhad) Pekan, Pahang.
2014 Consultancy for M & E works of houses KotoSAS Sdn. Bhd. Kuantan, Pahang
2020 Consultancy Service for Upgrading existing 30 TPH to 45 TPH at Sri Jelutung Palm Oil Mill Sri Jelutung Palm Oil Mill Sdn. Bhd. Pekan, Pahang
2020 Consultancy Service for Upgrading Work of 45 TPH to 100 TPH at Kilang Sawit United Bell. Kilang Sawit United Bell Sdn. Bhd. Pekan Nanas, Pontian, Johor
2022 Consultancy Services for Owner’s Engineer for 15 MT/Hour Steam Exploded Pellet Plant. Wilhelmina Engergy Malaysia Sdn. Bhd. / TG2 GmbH Kuantan, Pahang.
Year Project Owner Location
2006 45 TPH Tingkayu Palm Oil Mill N. Y. Hiew (Holdings) Sdn. Bhd. Tawau, Sabah.
2007 45-90 TPH Aumkar Palm Oil Mill Manilal & Sons (Malaya) Sdn. Bhd. Tawau, Sabah.
2008 45 TPH Sook Palm Oil Mill Chellam Plantation Group Keningau, Sabah.
2009 Extension of Sterilization Station for Haranky Palm Oil Mill Kwantas Group Lahad Datu, Sabah
2010 Extension Works for 40-60 TPH Tingkayu Palm Oil Mill Koong Shing Sdn. Bhd. Lahad Datu, Sabah
2010 45-90 TPH Yuwang Palm Oil Mill Yuwang Plantation Sdn. Bhd. Ulu Tingkayu, Tawau, Sabah.
2011 Extension of Sterilization Station for Mewah Palm Oil Mill Kwantas Group Lahad Datu, Sabah
2013 D60-90 TPH Pintasan Palm Oil Mill Kwantas Berhad Kinabatangan, Sabah.
2015 45-90 TPH Palm Oil Mill for Sukau Palm Oil Mill Sukau Palm Oil Mill Sdn. Bhd. Kinabatangan, Sabah.
Year Project Owner Location
2002 30-60 TPH Rangit Palm Oil Mill PT. Sumber Mitra Jaya Group Kalimantan Tengah, Indonesia.
2003 20 TPH Palm Oil Mill. Golden Hope Plantation Bhd. Kalimantan, Indonesia.
2003 Extension of Minanga Ogan Palm Oil Mill PT. Perkebunan Minanga Ogan Palembang, Indonesia.
2003 10 TPH of Palm Oil Mill. PT. Surya Borneo Indah (Vertical Sterilizer) Pontianak, Kalimantan Barat, Indonesia
2005 45-90 TPH PT. Tunas Sawaerma Palm Oil Mill. Korindo Group, Indonesia Papua, Indonesia. (Irian Jaya)
2005 Design of Rengat Vegetable Oil Bulking Installation Felda-Johore Bulkers Sdn. Bhd. Pekan Baru, Sumatra Indonesia.
2005 Design of Pontianak Vegetable Bulking Installation Felda-Johore Bulkers Sdn. Bhd. Pontianak, Kalimantan Barat, Indonesia.
2006 Extension of Kurnia Luwuk Sejati Palm Oil Mill P.T. Kurnia Luwuk Sejati Sulawesi Tengah, Indonesia.
2008 Extension of PT. Sungai Rangit Palm Oil Mill PT. Sempoerna Agro Kalimantan Tengah, Indonesia.
2010 45-90 TPH For PT. Agro Bukit Palm Oil Mill PT. Agro Bukit (A Goodhope Company) Sampit, Kalimantan Tengah, Indonesia.
2010 Design of Palm Oil Mill Bulking Installation for PT. Agro Indomas PT. Agro Indomas (A Goodhope Company) Sampit, Kalimantan Tengah, Indonesia.
2010 100-300 TPH Kernel Crushing Plant for PT. Agro Bukit Palm Oil Mill PT. Agro Bukit (A Goodhope Company) Sampit, Kalimantan Tengah, Indonesia.
2010 Extension Works for 90 TPH of PT. Agro PT. Agro Bukit (A Goodhope Company) Sampit, Kalimantan Tengah, Indonesia.
2012 30-60 TPH for PT. Pucuk Jaya Palm Oil Mill Chellam Plantations Group Balikpapan, Kalimantan Timur, Indonesia.
2012 45-90 FFB/hr for PT. Agro Wana Lestari (PT. AWL) PT. Agro Wana Lestari (A GoodHope Company) Sampit, Kalimantan Tengah, Indonesia.
2012 45-90 TPH Palm Oil Mill for PT. Parna Agromas LG Korea International Corporation Sintang, Kalimantan Barat, Indonesia.
2012 Three (3) bridges for PT. Agro Indomas PT. Agro Indomas (A GoodHope Company) Sampit, Kalimantan Tengah
2014 45-60 TPH for PT. Agro Indomas East Kalimantan (PT. AIEK) PT. Agro Indomas (A GoodHope Company) Balikpapan, Kalimantan Timur, Indonesia.
2014 30-60 TPH for PT. Agro Bukit South Kalimantan (PT. ABSK) PT. Agro Bukit (A GoodHope Company) Batu Licin, Kalimantan Selatan Indonesia.
2015 60 TPH Palm Oil Mill for PT. Wanasari Nusantara Southern Acids (M) Berhad Pekan Baru, Sumatra, Indonesia.
2015 45 TPH Palm Oil Mill for PT. Kutai Balian Nauli (PT. KBN) Chellam Plantation Group Sangata, Kalimantan Timur, Indonesia.
2015 30 TPH FFB/Hr for PT. Tunas Prima Sejahtera Palm Oil Mill Low Yat Group Samarinda, Kalimantan Timur, Indonesia.
2015 45 TPH Palm Oil Mill for PT. Sumber Hasil Prima PT. Sumber Hasil Prima Sarawai, Sintang, Kalimantan Barat, Indonesia.
2016 45 TPH Palm Oil Mill for PT. Anugerah Abadi Multi Usaha (PT. AAMU) PT. Anugerah Abadi Multi Usaha Kalimantan Timur, Indonesia.
2016 45 TPH Palm Oil Mill for New CPO Mill, Phase 1 Project. PT. Bio Inti Agrindo/
POSCO Plantec (Korea)
Merauke, Papua Island, Indonesia.
2017 30-45 TPH Palm Oil Mill for PT. Tebo Indah Agro Investama  Group Muara Tebo, Jambi, Indonesia.
2019 Supervising Consultant for PT. Nabire Baru PT. Agro Bukit (A GoodHope Company) Papua Province, Indonesia
2022 Consultancy Service for 45 – 60 TPH Palm Oil Mill integrated with Kernel Crushing Plant and Bulking Installation for PT. Nunukan Bara Sukses. The Pipit Group Nunukan, Kalimantan Utara, Indonesia.
2022 Consultancy Service for Bulking Installation for PT. Dwie Warna Karya Genting Plantation Palangkaraya, Indonesia.
2022 Consultancy Service for Bulking Installation for PT. Sepanjang Intisurya Mulia Genting Plantation Tambilok, Ketapang, Indonesia.
2022 Consultancy Services for upgrading of existing mill of 20 TPH capacity to Final Mill Capacity shall be 60 Metric Ton per Hour (Design). PT. Dendy Marker Indah Lestari (SIPEF) Lubuk Linggau, South Sumatera, Indonesia.
2023 Consultancy Services for 60/90 TPH Palm Oil Mill for PT. Kapuas Maju Jaya. Genting Plantation Kalimantan Tenggah, Indonesia.
2023 Engineering Consultancy Service for Proposed 60 Extended to 120 TPH Palm Oil Mill. PT. Bio Inti Agrindo Papua, Indonesia.
Year Project Owner Location
2006 Design of 50-100 TPH Vichitbhan Palm Oil Mill Vichitbhan Plantation Co.
Ltd (Main Consultant for
Rajawali Seroja Sdn. Bhd.)
Chumpon, Thailand.
2017 Consultancy Services for 30 TPH Expandable to 60 TPH Palm Oil Mill. Univanich Palm Oil Public Company Limited Phatthalung, Thailand
2017 Consultancy Service for Bulking Installation with Initial Capacity of 8,000 MT (2 nos. of 3,000 MT and 1 no. of 2,000 MT). Univanich Palm Oil Public Company Limited Lame Phong Jetty, Krabi, Thailand.
Year Project Owner Location
2003 Extension of Acydesa Palm Oil Mill Rajawali Seroja Sdn. Bhd. Honduras, Latin America.
Year Project Owner Location
2015 Consultancy Services for 15/45 TPH Palm Oil Mill Integrated with 20/50 TPD Kernel Crushing Plant Awala Plantation Olam International Limited Gabon, West Africa.
2016 Consultancy Services for 45 TPH Palm Oil Mill with and biogas plant for Mouila Plantation Olam International Limited Gabon, West Africa.
2017 Engineering Consultancy Service for Proposed Sotrader Warehouse at NKOK Plot D-6. Sotrader Gabon, West Africa.
2020 Consultancy Services for 45 TPH extendable to 90 TPH Palm Oil Mill with biogas plant for Mouila Plantation (2nd Line) Olam International Limited Mouila, Africa
2022 Consultancy Services for 45-90 TPH integrated with 75 TPD Kernel Crushing Plant for Mouila Lot 3, Mouila, Gabon, Africa. Olam International Limited Mouila, Africa
2022 Consultancy Services for completion of the Biogas Plant at Awala Palm Oil Mill, Kango, Gabon, Africa. Olam International Limited Gabon, Africa
2022 Consultancy Services for CPO bulking installation with storage capacity of 15,000 MT for Owendo Port, Libreville, Gabon, Africa. Olam International Limited Gabon, Africa
2022 Technical and Financial Feasibility Study of Latex Rubber Gloves Manufacturing Facility. Government of Ivory Coast Cote D’Ivoire, West Africa
[/vc_column_inner][/vc_row_inner]

Current Projects

In VIKNAtech Engineering Sdn. Bhd., we have a wide and in-depth know-how and knowledge in design, engineering and project management of Palm Oil Mills, Kernel Crushing Plants, Palm Oil Refinery and Bulking Installation.

Item Project Owner Location
1 Consultancy Services for Upgrading from 40 TPH to 60 TPH for Genting Ayer Item Oil Mill. Genting Oil Mill Sdn. Bhd. Ayer Item, Johor
Item Project Owner Location
1 Consultancy Services for Preparation & Submission of Documents and Obtaining Written Approval for Genting Sabapalm Oil Mill and Genting Tanjung Oil Mill. Genting Oil Mill (Sabah) Sdn. Bhd. Beluran, Sabah
2 Consultancy Service for 45 TPH Palm Oil Mill for Dalit Palm Oil Mill. Dalit Oil Mills Sdn. Bhd. (Chellam Plantations Group) Keningau, Sabah
3 Consultancy Service for Upgrading Existing 45 TPH to 60 TPH for Sook Palm Oil Mill. Sook Oil Mills Sdn. Bhd. (Chellam Plantations Group) Keningau, Sabah
Item Project Owner Location
1 Consultancy Services for 45-90 TPH capacity to Final Mill Capacity shall be 90 Metric Ton per Hour (Design). PT. Agro Muara  Rupit (SIPEF) South Sumatera, Indonesia.
2 Consultancy Service for 45 TPH Palm Oil Mill for PT. Bumi Sawit Sejahtera. IOI Plantations Group Kalimantan Barat, Indonesia.
3 Consultancy Services for 45 TPH Palm Oil Mill and Bulking Station for PT. Inti Agro Makmur. Freesia Venture Group South Sumatera, Indonesia.
4 Consultancy Services for 30 TPH Palm Oil Mill for PT. Kalimantan Prima Agro Mandiri. IOI Plantations Group Kalimantan Barat, Indonesia.
5 Consultancy Services for Fresh Fruit Bunch (FFB) Washing System for Sand Removal for PT. Sukses Karya Sawit. IOI Plantations Group Kalimantan Barat, Indonesia.
Item Project Owner Location
1 Consultancy Services for 30 TPH Expandable to 60 TPH Palm Oil Mill. Bounty Fresh Food Inc Mindanao, Philippines.